Another successful Power Distribution project has been completed.

Updated: Apr 12, 2021

The project concerned with:

The upgrade of an existing Substation 20/0.4kV with the replacement of two 20kV panels with environmentally-friendly vacuum technology (SF6 free) of Xiria series Eaton,

The installation of a new 1600kVA power transformer and the Low Voltage Distribution Panel in a Metal Industry in Oinofita.

The Low Voltage Distribution Panel (LVD - 2500 A) was designed with the possibility of switching its inputs, in a Π shape.

SABO S.A. undertook the upgrade project from its initial design to final tests and delivery to the customer.