Factory Acceptance Test (FAT) for a major Railway Tunnel Infrastructure project
- 20 hours ago
- 1 min read
Successful completion of the Factory Acceptance Test (FAT) for a major Railway Tunnel Infrastructure project — an important step toward the safe and reliable operation of this critical asset.
Our scope covered the tunnel’s operational and safety systems, including ventilation, lighting, alarm, and control subsystems. Through close collaboration between our engineering teams, the FAT confirmed full functional performance, system interoperability, and compliance with rigorous safety and operational standards ensuring readiness for on-site commissioning.

This milestone reflects our company’s commitment to engineering excellence, reliability, and disciplined project execution in the delivery of complex infrastructure systems.





